Skip to main content

LAPFORMER MANUFACTURES COMPANY

LAPFORMER:-

                 Lapformer is a machine preparing lap for next process called as Comber. The lap is produce by Breaker Drawing sliver, Is this limited number of slivers (16 to 32 Doublings) 


Lapformer Manufacture company list:-

  • RIETER
  • LMW
  • TRUTZSCHLER
  • MARZOLI


RIETER :-

                   RIETER is the world leading Textile machine Supplier of system for manufacturing yarn from stable fibers in spinning mills Based in SWITZERLAND 
Omega lap model in 2023 & 2024:-

                    Rieter card guarantees gentle opening, Efficient cleanings and intensive blending of fibers.


LMW LAPFORMER:-

                             LMW (LAKSHMI MACHINE WORKS LIMITED) is a leading machine manufacture in india. In 1962, LMW was founded to provide india textile mills with the latest Spinning technology.

Lapformer model in 2023 & 2024:-

TRUTZSCHLER SUPERLAP:-

                                     Trutzschler (Trumac)  was established in 1977 in Ahmedabad, India. Trutzschler mainly concentrate on supplying Blowroon machinery on 1981 to 1992. In 1992 Cards were added to the production program and in 2022 Draw frames. In 2009 they supply the machines to INDIAN MARKET under the brand name of "Trutzschler"

Superlap model in 2023 & 2024:-


MARZOLI CARD:-

                                               Marzoli Group start Textile machine manufactures from 1851. Today it represent the textile division of CAMOZZI group. That combines the Fibers preparation and Spinning process with most advance technologies.

Lap winder model in 2023 & 2024:-

NOTE:-
               The above content is some research and analyzes data. 



Comments

Popular posts from this blog

RKM

RKM INFORMATION This can be expressed by the “Length of yarn in km” at which yarn will break of its own weight”. This is equivalent to breaking load in g/tex. RKM is the short expression for “Reisskilometer” – “Breaking-kilometre”, which is an unit out of date. E.g.: a Cotton-yarn with 15 RKM means, it would break of its own weight, if you wind off 15 km of the yarn and hang it up in 15 km. Nowadays it is common practice, to use the unit Centi-Newton per Tex (cN/Tex) or gram-force per Tex (gf/Tex). RKM and cN/Tex or gf/Tex are practically the same (a slight difference would be there)   SINGLE YARN STRENGTH (Breaking force) :  This is the force required to break a strand of single yarn. It is expressing Centi-Newton (cN).     STRENGTH (Tenacity) : The Tensile Strength expressed as force per unit linear density is called Tenacity. This is normally expressed as gram force per tex (gf/tex).   CSP (Count Strength Product) : CSP, the bundle strength...

LOW RKM REASONS

LOW RKM REASONS TO START WITH SLIGHTLY RICHER MIXING AND BACK TO USUAL MIXING% GRADUALLY. AVOID BYPASSING OF THE BEATERS. CHANGING OF THE CARD LINES TO BE AVOIDED . TO START WITH HIGHER NOIL% AND REDUCE GRADUALLY TO USUAL    IF REQUIRED. SOFT WASTE ADDING TO BE AVOIDED FOR FIRST 3 OR 4 MIXINGS. IN SIMPLEX M/C CHECK THE FOLLOWING     a) FALSE TWISTER CONDITION     b) FLOATING CONDENSER CONDITION .     C) DAMAGE COT/APRON .     d) DEFECTIVE SADDLES .     f) TOP ARM LOAD .     g) PRESSER EYE CONDITION .     h) FLUFF ACCUMULATION ON FLYER HOLE .     i) BOBBIN CLEARANCE VARIATION .     j) CONE DRUM NOISE     k) FEED CAN CONDITION         l) SLIVER SPITING . IN SPINNING M/C CHECK THE FOLLOWING:     a) CRISIS-CROSS ROVING .     b) BOBBIN HOLDER ROTATION .     C)DAMAGE COT/APRON.     d)DEFECTIVE SADDLES.     f)TOP ...

HOW TO REDUCE CLASSIMATE FAULTS

REDUCING CLASSIMATE FAULTS 1) Count wise online Classmate classes wise results to be record on daily basis 2) Before allotting this work we want to educate quality investigator about Classmate faults and also class wise reasons we want to explain. While noting time investigator has highlight which class is having continuous higher side and same one communicate to that concern dept with reasons 3) We want to fix which classes we want to reduce 4) On daily basis monitoring we can get idea in which zone we r having problem and which zone we want to improve the work methods and process  5) Based on trend analysis we want to inspect process auditing and find out practical problems and also Training awareness we want to give to operators for reducing some classes  6) We can take process trials based on Online Classmate results  7) Regularly we want to compare daily Online results Vs Trial sample results for knowing Where we are Note: Choosing of quality investigator is import...