SPINNING MILL PRODUCTION FROMULA

 PRODUCTION FORMULAS :-

    In spinning mill we use production formula in short method. I recommend to use  formula in elaborate. First we need some basic details is given below

GENERAL:-

1 METER = 1.094 YARD

1 LEA = 120 YARD

7 LEA = 840 YARD

1 KG = 2.20456 POUNDS

1 CM = 10 MM

1 INCH = 2.54 CM

1 INCH = 25.4 MM

    In basically we use two formula mostly. one is where we have METER PER MIN and another one is where we have REVOLUTION PER MIN


MPM FORMULA:-

PRODUCTION FORMULA 8HRS = MPM*1.094*8*60/840/2.20456/HANK*EFF/100*NO. OF DELIVERY

EXAMPLE:-

Delivery speed in MPM = 150

Hank = 0.120

Eff = 96%

    In the above formula 8 means 8Hrs(Per shift), 60 means 60 Minutes


= 150×1.09×8Hrs×60Min÷840÷2.20456÷0.120×96÷100*1

=339 Kgs/Pershift

RPM FORMULA:-

PRODUCTION FORMULA 8HRS = RPM*8*60/36/840/2.20456/COUNT/TPI*EFF/100*No. of delivery

EXAMPLE:-

Spindle speed in RPM = 1350

Hank = 1.14

Tpi = 1.59

Eff = 80%

    In the above formula 8 means 8Hrs(Per shift), 60 means 60 Minutes


=1350×8Hrs×60Min÷36÷840÷2.20456÷1.14÷1.59×80÷100*176(No. of Delivery)

=755 Kgs/Pershift

COMBER NPM PRODUCTION FORMULA 8HRS:-

FORMULA = NPM*8*60*NO. OF HEADS*FEED PER NIP* GMS /PER METER*(100-NOIL)/1000*1000*100*EFF/100

EXAMPLE:-

Delivery speed in NPM = 475

FEED /PER NIP = 4.75

NOIL = 18%

Eff = 95%

    In the above formula 8 means 8Hrs(Per shift), 60 means 60 Minutes


=475×8Hrs×60Min×8 HEADS×4.75×70(100-18)÷1000÷1000÷100×95÷100 = 472 Kgs/Per shift.

COMBER FEED PER NIP FORMULA :-

FORMULA = 3.14×BOTTOM ROLLER DIA÷RATCHET WHEEL TEETH

EXAMPLE:-

Ratchet wheel teeth = 20

Bottom roller dia = 30

FEED /PER NIP = 4.71

=3.14×30÷20 = 4.71


Comments

Popular posts from this blog

RKM

LOW RKM REASONS

HOW TO REDUCE CLASSIMATE FAULTS

Subscribe for Free Articles

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

* indicates required

Intuit Mailchimp