CONTROL UKG IN RINGFRAME :- 1)Working with Lower Ring frame TM 2) Working with Lesser Ring dia 3) Lift conversation 4) Correct usage of combination of RF empty Tube vs Spindle height (20 mm ) 5) Maintain correct speed curve, high speed reach before 25% of final length of the yarn to be produced 6) Usage of Higher efficiency of Main motor(94.5%) 7) Avoid Light doffs and check doff has to fall at set doff length meter 8) Usage of Energy efficient Fan motor( Less weight Fans ) 9) Instead of continuous running of OHTC from one to another end of the Ringframe, every reversal attend of the machine, We can stop OHTC for 1-5 minutes 10) Usage of light weight cops in ringframe 11) Maintain proper schedule of Spindles replacing 12) Maintain proper Jockey pulley servicing and greasing 13) Working with short strech conversation 14) Working with energy saving spindle tapes 15) Maintain perfect schedules of motor greasing and other elements bearings The following precautions to be taken while cond...